Electrostatic powder coating in Bursa

Two facilities in NOSAB and Alaaddinbey. Six-stage nano pretreatment, PLC-controlled booths and a 30-metre tunnel oven — your part travels one line, from degreasing to curing.

Color Center application chart

Our references

All our references
stage pretreatment
6
tunnel oven
30 mt
conveyor line
402 mt
per-hanger capacity
240 kg
enclosed production area
4.200
production plants
2

Coating life is decided by pretreatment, not by paint

The six stages of our spray line bring the surface to a state where the coating bonds chemically. What each stage does:

Degreasing (alkaline)

Oil and grease left by machining, cutting and handling are dissolved in an alkaline bath. Skip this and every following stage works on a dirty surface.

Rinse

Reduces the chemical carry-over from the alkaline bath. Residual alkali would upset the chemistry of the nano coating bath.

Outer rinse 1

The second rinse lowers conductivity further and prepares the surface for the conversion layer.

Nano conversion coating

A thin conversion layer is left on the surface. It raises corrosion resistance and forms the surface the powder bonds to chemically. It gives a thinner layer and less waste than classic phosphate processes.

Outer rinse 2

Residue carried from the conversion bath is removed, along with salts that would leave marks on the surface.

Drying oven

All water is driven off the surface. A part entering wet prevents powder adhesion and causes blisters in the curing oven.

Two plants, uninterrupted capacity

See all

A stoppage on one line does not stop deliveries. NOSAB carries the fully integrated tunnel line; Alaaddinbey carries off-line work and extra capacity.

NOSAB Facility

NOSAB Facility

Minareliçavuş OSB Mah. 116. Sok. No:11, Nilüfer / BURSA

2,000 m² enclosed area, 168 metres of conveyor, a team of 35. The tunnel line, spray line and powder booths are here.

  • Spray Line
  • Powder Coating Booth
  • Tunnel Oven
View
Alaaddinbey Facility

Alaaddinbey Facility

Alaaddinbey Mah. Alaaddinbey Köy Yolu Cad. No:37/1, Nilüfer / BURSA

2,200 m² enclosed area, 234 metres of conveyor, a team of 40. Alongside the tunnel line and spray line, sandblasting and the box-type booth and oven are here.

  • Spray Line
  • Tunnel Oven
  • Box-Type Booth and Oven
  • Sandblasting
View

Quality is a controlled process

Our Quality Policy has six clauses, and our Quality Management System is reviewed with periodic checks.

  • Customer satisfaction

  • Following change

  • Full participation of our employees

  • Competitive advantage

  • Cooperation with suppliers

  • Continuous improvement

Color Center ISO 9001:2015 Quality Management System certificate
ISO 9001:2015 · QMS-005460 · IQR International
Electrostatic powder coating activities for the automotive sector

Describe your part and we will find the right line together

Send us dimensions, material, quantity and the RAL code you want; we will come back with the suitable line and the lead time.